Monday, January 14, 2008

Le Deuxième Jour

On the second day of construction I worked mainly on finishing the hole for my head.  When I finished that, I started to trim away large pieces of foam that wouldn't be wanted when I started sanding.

The hole in the foam when I started working.

It got to a point where I didn't use the drill anymore 
because I didn't want to dig too deep.

I used a cheese grater like carving tool to slowly 
shave away and smooth the foam on the inside of the hole.  

When I finished with the hole, I used a saw 
to cut away the extra foam on the side 
that will be the back of the helmet.

The pointed side will be sanded down 
to be rounded and smooth, but I decided 
to save the sanding for the next day.


Day's Total Work Time: 30 Minutes

No comments: