Sunday, January 13, 2008

Let the Games Begin...

Here are some pics from the first day of construction of the helmet...

I took a plank of hard insulation foam, 
cut it every 15 inches lengthwise, 
and used "Liquid Nails" join them all together.

I let the block of foam set for 24 hours with weight on it 
so that it would get a nice, solid adhesion.

I began to bore a hole at about the center of the foam block.


After about a half hour I had made a hole wide enough 
to fit both of my fists in. All the drilling to this point 
took about 30 minutes, and I called it a day.


Day's Total Work Time: 30 Minutes

No comments: